ion of the 815 km (506 mi) section between Xining and Golmud was completed by 1984. The 1,142 km (710 mi) section between Golmud and Lhasa was inaugurated on July 1, 2006, by Chinese President Hu Jintao: the first two passenger trains were "Qing 1" (Q1) from Xining to Golmud, and "Zang 2" (J2) from Golmud to Lhasa.[1] This railway is the first to connect the Tibet Autonomous Region to any other province, which, due to its elevation and terrain, is the last

0 comments Blogger 0 Facebook

Post a Comment

 
Nepali Samachar © 2013. All Rights Reserved. Powered by Blogger
Top